Undersea cable pitched for clean energy

A company known mostly for wind projects is reviving a proposal to connect the Vancouver Island and Washington electricity grids

Wind farm development in northeastern B.C. Proponents of a new power line between Vancouver Island and Washington say it would make wind power a more stable source.

VICTORIA – With BC Hydro struggling to control electricity rate increases and cutting back on private power acquisition, a company known mostly for wind projects is reviving a proposal to connect the Vancouver Island and Washington electricity grids.

Sea Breeze Power Corp. wants to build a 50 km transmission cable under the Strait of Juan de Fuca to connect substations near Port Angeles and Victoria. To finance the project, it’s looking for a 10-year deal to assemble surplus U.S. power and sell it to BC Hydro at a flat rate of $69 per megawatt hour.

Sea Breeze CEO Paul Manson said the power purchase would finance the construction of the cable and deliver a steady source of electricity to B.C. at lower cost than new sources built in the province. It would also improve power quality and reliability for Vancouver Island residents, he said.

First proposed in 2006, the project has received environmental permits from both sides of the border. It was rejected by the B.C. Utilities Commission, which approved upgrading the existing power line from the B.C. mainland to Vancouver Island instead.

Sea Breeze developed a wind project at Cape Scott on northern Vancouver Island, and has plans and permits for other wind sites on the B.C. coast and the Peace River region. Manson said the Juan de Fuca cable would stabilize wind power supply on the B.C. coast, where wind speeds peak in winter, with inland Washington sites where it’s windiest in summer.

Manson said U.S. policy led to major wind development that leaves the the Pacific Northwest with an excess of power in spring, meaning the Washington power utility has paid BC Hydro to take its excess when hydro dams are full.

The cable would also give B.C. more capacity to buy cheap overnight coal and nuclear power from the U.S., which BC Hydro already does with its main connecting line along Interstate 5, he said.

Energy Minister Bill Bennett said the Juan de Fuca cable is one of many proposals that came forward as BC Hydro developed its integrated resource plan. That plan estimates that with conservation and efficiency improvements in B.C., the province will need more electricity supplies within eight years.

The company has not yet demonstrated that it can assemble the firm electricity it proposes to sell, and the project has “a pretty steep slope to climb,” Bennett said.

 

Just Posted

Castlegar Rebels take flight in win over Grand Forks

Team speed was too much for the visiting Grand Forks Border Bruins to handle.

Property crime on the rise in Grand Forks: RCMP

Grand Forks RCMP sat down with the Gazette to talk property crime and community solutions.

RDKB elects Russell as board chair

Grace McGregor will be vice-chair of the board.

MLA Larson wants to abolish daylight saving time

Okanagan-Boundary MLA put forward private member bill

BETHS working to develop shelter/hub

the group is hioping the shelter will be ready for next winter.

VIDEO: Best photos of the Supermoon 2017

At its closest, the Frost Moon was about 363,300 km away from the Earth

Site C decision coming Monday

Premier John Horgan to announce fate of dam project at B.C. legislature

VIDEO: Vancouver Whitecaps acquire star striker Kei Kamara

Kamara has 103 goals and 39 assists in 298 appearances over 11 Major League Soccer seasons

Smartphone pedometers underestimate steps, but valuable health tool: study

UBC researchers found the iPhone underestimated steps by 21.5 per cent

VIDEO: ‘Last Jedi’ premiere kicks off with droids, Daisy Ridley

Latests Star Wars film premiered in style ahead of Dec. 15 theatre debut

UPDATE: Poor ventilation likely cause of carbon monoxide incident at B.C. farm

All 42 patients have been released from hospital, according to Delta Fire

BC Lions part ways with three coaches

These are the first personnel moves made by new general manager Ed Hervey

VIDEO: B.C. to end geographic area rent increases, close fixed-term lease loopholes

Both clauses allowed landlords to raise rents above the max annual allowable rent increase

Most Read