Proposed route of twin pipeline that would carry light petroleum liquids east to Alberta and diluted bitumen west to Kitimat.

Scientists rap Enbridge pipeline review

Panel counted benefits from production, but not risks of consumption of heavy oil, Prime Minister Stephen Harper told

The federal review panel for the Enbridge Northern Gateway proposal downplayed the risks of a heavy oil pipeline and tanker terminal at Kitimat, and its endorsement should be rejected, 300 scientists have told Prime Minister Stephen Harper.

The federal cabinet is expected to release its decision on the project this month, after a review panel report in December recommended it is in the public interest.

A letter from two University of B.C. scientists and one from Simon Fraser University, endorsed by academics and graduate students from around the world, was released this week. It says the panel’s report took “a broad view of the economic benefits, but an asymmetrically narrow view of the environmental risks and costs.”

The benefits come to Alberta oil sands producers from an expected higher price for their crude in Asia. But the environmental risks assessed by the panel are limited to transportation by pipeline and tanker, and omit the risks and emission effects from production and later consumption of the oil, the letter states.

Northern Gateway project leader Janet Holder said the joint review panel (JRP) weighed evidence of from top experts in the field.

“By actively seeking to undermine the work of these experts outside of the JRP process, the signatories of this letter are denying the experts an opportunity to defend their work,” Holder said.

The Harper government has signalled in recent weeks it is preparing to green-light the project. On May 14, Natural Resources Minister Greg Rickford and Transport Minister Lisa Raitt announced a new rule for federally regulated pipelines, assigning “absolute liability” for costs and damages of $1 billion even when their operation is not at fault. This is on top of unlimited liability when the operator is at fault or negligent.

On May 27, Rickford announced a new major projects management office for Western Canada, intended to increase aboriginal employment and business opportunities related to pipelines, tankers and safety systems to protect them.

The JRP report cited 209 conditions, including a protection plan for whales and other marine mammals and continued work on heavy oil cleanup.

Northern Gateway officials say their marine spill prevention and response capabilities would be more than three times required by existing law. Pipeline steel would be 20% thicker than required, with the pipelines monitored and pump stations staffed around the clock.

 

Just Posted

Slocan Valley to be ‘lit up’ with high-speed internet in 12 months

125 kilometres of fibre-optic cable to be laid from Nakusp to Playmore Junction

RED resort announces new ski lift

Topping lift will add new ski area to resort, reduce bottleneck on Motherload chair

Paramedics union raises alarm over spike in out-of-service ambulances

Staffing shortages affecting service levels in Kootenays

Kim Johnson retires from rec department

Johnson had worked at Grand Forks Recreation Department for 25 years

COLUMN: 2018 second-largest on record for food bank

Boundary Community Food Bank added 109 new clients last year

Sparks fly as SUV speeds down wrong side of Highway 1 trying to flee RCMP

Captured on video, the vehicle headed westbound against oncoming traffic before crashing

Fundraising campaign launched for man caught in SilverStar avalanche

In only two days, the GoFundMe surpassed its $15,000 goal

Terror at sea: Helicopter rescues frightened cruise passengers in Norway

The Viking Sky cruise ship was carrying 1,300 passengers and crew when it experienced engine trouble

Search and rescue team helicopters injured climber from B.C. provincial park

A 30-year-old woman suffered a suspected lower-limb fracture in Skaha Bluffs Provincial Park

DOJ: Trump campaign did not co-ordinate with Russia in 2016

Attorney General William Barr said special counsel “does not exonerate” Trump of obstructing justice

Trudeau in Vancouver to support Tamara Taggart at Liberal nomination event

The former broadcaster is seeking the nomination for the Vancouver Kingsway riding

Trudeau calls May 6 byelection for B.C. riding of Nanaimo-Ladysmith

The riding opened up when Sheila Malcolmson resigned in January

B.C. VIEWS: The hijacking of our education system gathers speed

Children taught to strike and shout fringe far-left demands

Judges on Twitter? Ethical guidance for those on the bench under review

Canadian judges involvement in community life are among issues under review

Most Read