Diversion tunnels have been completed to redirect the Peace River during low water this summer, in one of the most critical steps to completing the Site C dam, March 2020. (BC Hydro)

New rules issued for B.C. construction projects, work camps for COVID-19

Coastal GasLink, LNG Canada, Trans Mountain and Site C carry on

As protest groups use the COVID-19 pandemic to renew their fundraising and calls for pipeline projects and the Site C dam to be stopped, the B.C. Centre for Disease Control has issued new guidance to employers managing industrial sites and camps during the novel coronavirus pandemic.

Construction has been designated an essential service by provincial health officer Dr. Bonnie Henry as of March 26, as part of a lengthy list of activities ordered to continue by Public Safety Minister Mike Farnworth.

The BCCDC advises hand washing and cleaning supplies, and disposable gloves and masks (or tissues if masks not available) to be issued to suspected or confirmed cases of COVID-19 who are isolated.

Henry has noted that it isn’t safe or practical to simply shut down large ongoing projects like Site C, which is preparing to divert the Peace River this summer in a critical phase of completing BC Hydro’s third dam in the region. The Coastal GasLink pipeline and the Trans Mountain pipeline expansion are continuing with reduced work-forces as they prepare for the spring thaw that results in soft, wet conditions for heavy machine work.

“Construction sites are not as high a risk an environment, as we know, because they’re mostly outdoors so there are ways of mitigating risk in those sites,” Henry said in her daily briefing March 25.

The BCCDC rules for prevention and control in work camps call for any employee showing symptoms to be separated from others and isolated, “unless they are within close driving distance of their home and are able to safely drive home without using shared transportation.”

It also advises employers with camps to check with the local medical health officer on whether to conduct testing of suspected cases in camps.

The essential service designation is a significant responsibility for the industry, says Chris Gardner, president of the Independent Contractors and Businesses Association.

“Many construction companies have gone beyond those measures and put even more stringent safety protocols in place,” Gardner said in a statement March 31, referring to measures outlined by WorkSafeBC and the B.C. Construction Safety Alliance. “These measures are not optional – they are the rules of doing business in the new reality we face today.”

The rival B.C. and Yukon Building Trades Council, representing traditional construction unions, has called for remote camps to reduce activities to essential and “critical-path work.” It has praised WorkSafeBC’s efforts to respond to worker complaints as construction around the province adapts to COVID-19 precautions.

“We’ve been heartened by contractors like Oceanview Mechanical in Victoria, where workers built, installed and plumbed in water for their own hand-washing stations at six residential condominium sites,” said Andrew Mercier, executive director of the B.C. Building Trades.

RELATED: Rest stops barring access to truckers ‘a huge problem’

RELATED: ‘This is no joke’ says B.C. woman in Alberta hospital

As of March 30, BC Hydro reports there were no confirmed COVID-19 cases at the Site C camp. The camp is currently housing 819 workers with four in isolation for 10 days after reporting any of the following symptoms: sneezing, sore throat, muscle aches, headaches, cough, fever or difficulty breathing.

“BC Hydro is being very cautious with our application of the guidelines and asking people to self-isolate with any slight symptom,” says the daily update on the Site C project website.

In mid-March, contractors working at Site C were directed to use the province’s online self-assessment tool to examine their health conditions. That advice is also part of the latest BCCDC directive.

On March 16, LNG Canada said it is reducing its Kitimat workforce by half, where construction is underway for a liquefied natural gas export facility connected to the Coastal GasLink pipeline.

Trans Mountain has suspended all non-essential business travel and is incorporating the latest BCCDC and WorkSafeBC protocols.

“We are committed to maintaining the uninterrupted operation of the Trans Mountain pipeline and continuing construction of the expansion project while taking a number of steps to help flatten the curve and slow the spread of the virus,” the federally-owned company said March 19.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC legislatureCoronavirusSite C

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

RDKB issues evacuation alert for 1,100 Boundary properties

Warm weather and heavy rain could cause sections of Kettle River system to swell beyond 2018 levels

RDKB launches survey to address housing needs in the district

Communities in the district include Trail, Grand Forks, Rossland and Fruitvale

Possible Kermode Bear spotted near Castlegar

A local resident spotted the white-coloured bear while on an evening trail run on May 27

Stolen truck found in Christina Lake

Family happy the vehicle was found

Two more Johnson Flats properties given evacuation alerts

Forecast graphs for Boundary rivers show another spike for week of June 1

Only four new COVID-19 cases, 228 active across B.C.

Health officials watching as activities ramp up

Feds looking at ways to reunite families amid COVID-19 border restrictions with U.S.

Some families with members of dual-citizenship have become separated due to the pandemic

Condition in kids with possible COVID-19 link being studied in Canada

This month, the U.S. Centers for Disease Control and Prevention issued an alert to doctors about MIS-C

‘I knew what he wanted’: Man recalls black bear chasing him up tree in Slocan Valley

Francis Levasseur is no stranger to the outdoors, but a recent run-in with a bear caused quite a scare

COVID cancelled their wedding plans, so they married on a BC mountaintop

Ceremony was live streamed to friends and family around the world

Trudeau acknowledges racial unrest in U.S.; ‘We also have work to do in Canada’

‘Anti-black racism, racism, is real; it’s in the United States, but it’s also in Canada,’ Trudeau says

State of Local Emergency declared for Boundary as communities brace for river flooding

Warm weather and heavy rain could cause sections of Kettle River system to swell beyond 2018 levels

Large cruise ships barred from Canadian waters until end of October: Garneau

Last year 140 cruise ships brought more than two million visitors to Canadian ports

Minneapolis cop who knelt on man’s neck charged with murder

Arrest comes after three days of protests, which escalated in violence as demonstrators torched a police precinct

Most Read