Containerized LNG could be the latest product to be manufactured at the Skeena Industrial Development Park in Terrace. (Taisheng International Investment Services photo)

Chinese firm proposes LNG processing plant near Terrace

Project to be located within the Skeena Industrial Development Park near airport

A Chinese distributor of liquefied natural gas wants to build a processing facility near Terrace, next to the regional airport.

Top Speed Energy sent a letter to area residents on Oct. 16, seeking feedback on a facility that could process 150,000 tonnes of LNG per year – about 0.6 per cent of what’s manufactured at LNG Canada’s multi-billion-dollar facility in nearby Kitimat.

The project is small enough for the company to bypass federal and provincial environmental assessments, the letter said. It will instead submit a permit application to the BC Oil and Gas Commission and any required applications to the City of Terrace.

The facility would receive natural gas from a nearby pipeline, and then transport the finished product by truck to a terminal in Prince Rupert and on to domestic and international markets.

The number of containers is expected to be handled within the terminal’s existing capacity, and “is not a driver for terminal expansion,” said the letter, signed by Clark M. Roberts, the CEO of the firm’s Canadian arm, based in Burnaby.

The 1,187-acre plot of land, in a business park next to the Northwest Regional Airport, was bought in 2014 by Taisheng International Investment Services, which later signed a development agreement with the city. No additional roads will be built.

Residents and organizations have until Nov. 6 to send in written feedback. They can also request a meeting with the company.

This isn’t TSE’s first jump into LNG exports from B.C. to Asian markets. FortisBC, a utility company operating a liquefaction facility on the Fraser River near Vancouver, signed Canada’s first long-term supply agreement to produce LNG for export to China with TSE in July.

Under the two-year agreement, 53,000 tonnes of LNG will be shipped from the Tilbury facility in B.C. to China by summer 2021.

READ MORE: FortisBC eyes expansions after inking deal to send LNG by container to China

READ MORE: Pacific Northern Gas moves to reinstate full capacity and expand pipeline

TSE LNG Facility Letter by Brittany Gervais on Scribd

Like us on Facebook and follow us on Twitter

Just Posted

B.C. taxi drivers no longer exempt from wearing a seatbelt

Before, taxi drivers were allowed to forego a seatbelt when driving under 70 kilometres an hour

Police seize drugs, weapons and cash from Christina Lake residence

One man was arrested when RCMP executed a search warrant on Nov. 14

Moose tests positive for Chronic Wasting Disease in northwest Montana

This is the first time the disease has been detected in the species in Montana

Warfield Director elected to head seat on regional board

Mayor Diane Langman is board chair of the Regional District of Kootenay Boundary

Green candidate reflects on South Okanagan-West Kootenay campaign

Rosslander Tara Howse talks about the highs and lows of running for office

VIDEO: Disney Plus adds disclaimer about racist stereotypes

Disney’s disclaimer is a good way to begin discussion about the larger issue of racism

Car dash covered in papers not an excuse for speeding, Delta police warn

After puling the driver over for speeding, police found his speedometer blocked by a stack of papers

B.C. woman seeks return of jewelry box containing father’s cremated remains

Sicamous RCMP report handmade box was stolen from a storage locker

Vancouver police officer charged with sexual assault in apparent off-duty incident

Jagraj Roger Berar, 51, of Surrey, charged in incident alleged to have happened in Whistler

CN Rail confirms job cuts as weakening economy cuts into freight volumes

Railroad also said it was affected by a slowdown in the B.C.’s forestry sector

Port Alberni mom takes school district to court over Indigenous smudging, prayer in class

Candice Servatius, who is an evangelical Christian, is suing School District 70

New case of vaping-related illness in Quebec brings national total to 8

Quebec health minister considering tightening the rules around vaping products

Greens to vote against Liberal throne speech unless carbon targets toughened: May

Green leader Elizabeth May and Prime Minister Justin Trudeau met Friday, discussing common ground

First Nations ‘optimistic’ about road upgrades after Horgan visits site of fatal bus crash

Premier travelled Bamfield Main road, where bus flipped last September and two students were killed

Most Read